View Single Post
recycled sixtie recycled sixtie is online now
Registered
 
recycled sixtie's Avatar
 
Join Date: Oct 2011
Location: Edmonton Canada
Posts: 5,965
Garage
Just a few thoughts here. Make sure you know where the property boundaries are. Is another survey needed or can you locate the survey pins? This is not a one man job as it sounds like it needs two men.

I have built fences myself but not as many holes as your project. I have hand augured all the holes but that takes time. Obviously with that many holes a motor auger is necessary and two beefy men one on each side.

Once the holes are drilled then it helps to have two men to put the posts in a line and straight. A business doing this kind of work would probably get it straighter than I ever could. You could get a business to do it totally or you could be a helper. With the motor auger drilling sometimes you can catch a rock. That is where the young muscle helps as the machine can give a good kick. Get two or three quotes and preferably a referral as well.
Old 05-21-2017, 02:25 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #3 (permalink)