Quote:
Originally Posted by kach22i
I think the time lines are rather pessimistic considering published engine testing is nearly a decade old, and the photographic evidence of flying prototypes is all over the Internet.
|
Right? The A-12 contract was awarded in 1960 and the SR-71 was delivered starting in 1966 and in operational use by 1968.