View Single Post
look 171 look 171 is online now
Registered
 
Join Date: Mar 2004
Location: Los Angeles
Posts: 17,705
Motion,

Depending on the length of the slab, they can drill through rught under it. Connect on the house or yard side and run new pipe through new hole and reconnect at the meter. No need to break slab, usually.
Old 06-17-2017, 05:53 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #3 (permalink)