|
About all you can do is locate the holes on all four sides and try to diagram out where they are. They are generally laid in pretty straight lines, assuming your contractor wasn't an idiot. You might try to locate them magnetically but that may be difficult, especially if they installed rebar or mesh as well as the cables.
|