Quote:
Originally Posted by rfuerst911sc View Post
...... I plan on pouring two pads 24 " x 24 " about 10 " thick for the lift posts and the rest of the floor will be about 5 " - 5.50 " thick .
I missed this....

We dug a channel approximately 6" deeper, between where the 2 posts were going, with a few extra rebar across. This made a grade beam/footing.

I would not pour those two pads independently of the floor pour, it will be weaker.
__________________