View Single Post
javadog javadog is online now
Registered
 
Join Date: Apr 2005
Location: outta here
Posts: 54,820
The way that those posts are set into the ground, don't expect them to last all that long. You can't have (even treated) lumber contacting soil.

It's also going to be a ***** to grade the area under the deck. He should've graded the area before he started, or at the very worst, after he set the posts but before he put the deck surface down.

I'm not trying to be the bearer of bad news but this guy did a bunch of things wrong.
Old 09-17-2017, 03:37 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #21 (permalink)