|
Registered
Join Date: Apr 2001
Location: Linn County, Oregon
Posts: 48,891
|
I did go the tuff shed route.. 8X18. Watched the four man crew put it up in about 4 hours. This after I'd had the site graveled, leveled, and rolled. Couldn't be happier.
No permit was needed here. For the price, I couldn't have purchased the materials..
__________________
"Now, to put a water-cooled engine in the rear and to have a radiator in the front, that's not very intelligent."
-Ferry Porsche (PANO, Oct. '73) (I, Paul D. have loved this quote since 1973. It will remain as long as I post here.)
|