Unfortunately, the panels are in place and we are wrapping up the project. I got there well after drywall, so we can’t move anything.

The problem is the electrician installed them in the wrong location after the first three bldgs.

Where we once planned on installing a wire shelf, we can’t because of the 30” rule.

My thinking is that we can locate the wire shelf on the other side of the panel and maximize the width by pushing the 30” to the other side.

This is what it should look like, but the electrician has installed the panels to close to the wire shelf.

The panel should have been installed were the structured wiring panel is.