Pelican Parts
Parts Catalog Accessories Catalog How To Articles Tech Forums
Call Pelican Parts at 888-280-7799
Shopping Cart Cart | Project List | Order Status | Help



Go Back   Pelican Parts Forums > Miscellaneous and Off Topic Forums > Driver's Lounge


Reply
 
LinkBack Thread Tools
Author
Thread Post New Thread    Reply
Registered
 
Join Date: Jan 2017
Location: Denver, CO
Posts: 907
Garage
Interrstate Hwy reconstruction

10 miles of I-70 through northeast Denver is being widened and sunken. The section east of I-25 to Colorado Blvd has a been a 6-lane elevated viaduct through a neighborhood since it was built in the 60"s. They are changing to a 12-14 lane ditch and tunnel. The tunnel will give space for a soccor field and a performing arts amphitheater. The engineering behind rain water management was a marvel in itself, but we don't see much about it.

video going through the westbound side of the tunnel
https://www.youtube.com/watch?v=h6nP6kd60V4

What it will look like



If you are interested, here is a synopsis of the entire 10-mile project
https://www.youtube.com/watch?v=EQURDcHZArc

Throughout the entire project, six lanes have always been open

[/SIZE]

__________________
Ken

'69 911E

Last edited by kghjr; 05-29-2021 at 07:51 PM..
Old 05-29-2021, 11:22 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #1 (permalink)
Reply


 


All times are GMT -8. The time now is 08:39 PM.


 
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2025 Pelican Parts, LLC - Posts may be archived for display on the Pelican Parts Website -    DMCA Registered Agent Contact Page
 

DTO Garage Plus vBulletin Plugins by Drive Thru Online, Inc.