![]() |
i'm not doing the whole house in one go, Jim... just little bit's along the way...
just did some finishing work on the doubleglazing they installed this week. http://forums.pelicanparts.com/uploa...1267892395.jpg i'm not going to win any prizes, but it'll do for now... the front will get done in a couple of years, gotta balance my budget between gathering parts for the future 911, and the house.. |
Quote:
We're doing inexpensive projects at present such as painting. Still shopping for deals on counter tops/cabinets. I like quality materials but hate the exorbitant pricing. Didn't you do some garage work to start with? |
i initially thought about building a work bench, but ended up buying 2 1.5 meter pre-built benches...
Other then that, not much done to the garage. spent my time putting in a roof window , insulating, and building a shower.. it's functional, but need to get it finished cosmetically... Realistically, i'm not good at finishing things, cosmetically And can't be arsed to pay somebody to make things prettier... I don't think that will change, not until i have a 911 with running engine I have no wife or gf... so i have nobody setting my priorities straight with important things... No nagging either when something isn't finished on target, or according to some kind of interior design plan :D |
| All times are GMT -8. The time now is 01:17 PM. |
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2025 Pelican Parts, LLC - Posts may be archived for display on the Pelican Parts Website