Pelican Parts
Parts Catalog Accessories Catalog How To Articles Tech Forums
Call Pelican Parts at 888-280-7799
Shopping Cart Cart | Project List | Order Status | Help



Go Back   Pelican Parts Forums > Porsche Classified Ads > Porsche 914 Used Parts For Sale & Wanted


Reply
 
LinkBack Thread Tools Rate Thread
Author
Thread Post New Thread    Reply
Registered
 
Join Date: Aug 2013
Posts: 197
Garage
FS: Gauges, accessory with long lead wires

Temp and Volt Gauges with wiring for a clock as well - clock has been removed but wires and light still intact. All attached to a 10ft pigtail of modern wiring. $55 shipped.




Old 04-15-2020, 08:22 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #1 (permalink)
Registered
 
Join Date: Aug 2013
Posts: 197
Garage
BUMP

Old 04-26-2020, 08:10 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #2 (permalink)
Reply


 


All times are GMT -8. The time now is 04:26 PM.


 
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2025 Pelican Parts, LLC - Posts may be archived for display on the Pelican Parts Website -    DMCA Registered Agent Contact Page
 

DTO Garage Plus vBulletin Plugins by Drive Thru Online, Inc.