Bland
Join Date: Nov 2003
Location: I'm 'out there...'
Posts: 8,592
|
Actually the correct way to abandon a well is to set a packer (bridge plug) then put 30’ of cement (not concrete) on top, then pressure test after 24 hours, then fill with inhibited water (anti corrosion), then cut and cap 6’ below surface, then back fill.
__________________
06 Cayenne Turbo S and 11 Cayenne S
77 911S Wide Body GT2 WCMA race car
86 930 Slantnose - featured in Mar-Apr 2016 Classic Porsche
Sold: 76 930, 90 C4 Targa, 87 944, 06 Cayenne Turbo, 73 911 ChumpCar endurance racer - featured in May-June & July-Aug 2016 Classic Porsche
|