|
The $850 was the assembly charge. The other machine work and parts etc added up to about $3500. With the P&Cs, cams, new crank and rods, I have $6000 into it.
__________________
James
The pessimist complains about the wind; the optimist expects it to change; the engineer adjusts the sails.- William Arthur Ward (1921-1994)
Red-beard for President, 2020
|