|
|
|
|
|
|
The Unsettler
|
Name that tune.
I like the band My Morning Jacket.
But this track from 2003, it seems they were in the studio and decided to see how many iconic songs they could combine and get away with it. Starts with Manfred Mans version of Blinded By The Light, picks up the bass line from Crazy Train and layers in the guitar from Sweet Child o Mine. Hearing some Simple Man in there from around 2:05 and a bit of a Zeppelin tune I can't put my finger on. What other tidbits do you guys recognize. If you discover something post the tune and timecode.
__________________
"I want my two dollars" "Goodbye and thanks for the fish" "Proud Member and Supporter of the YWL" "Brandon Won" |
||
|
|
|
|
Max Sluiter
|
Great tune. Sounded original enough to me. The "inspiration" was subtle at least in the main body of the song.
__________________
1971 911S, 2.7RS spec MFI engine, suspension mods, lightened Suspension by Rebel Racing, Serviced by TLG Auto, Brakes by PMB Performance |
||
|
|
|
|
RETIRED
|
My all time most hated song......I run away screaming...that damned calliope.
__________________
1983/3.6, backdate to long hood 2012 ML350 3.0 Turbo Diesel |
||
|
|
|
|
(the shotguns)
Join Date: Feb 2006
Location: Maryland
Posts: 22,004
|
Never heard of them until I saw an American Dad episode with them. I thought 'holy cow how have I never heard this?'.
Not a sound I could indulge in every day but definitely a great vibe.
__________________
***************************************** Well i had #6 adjusted perfectly but then just before i tightened it a butterfly in Zimbabwe farted and now i have to start all over again! I believe we all make mistakes but I will not validate your poor choices and/or perversions and subsidize the results your actions. |
||
|
|
|