Pelican Parts
Parts Catalog Accessories Catalog How To Articles Tech Forums
Call Pelican Parts at 888-280-7799
Shopping Cart Cart | Project List | Order Status | Help



Go Back   Pelican Parts Forums > Porsche Forums > Porsche 911 Technical Forum


Reply
 
LinkBack Thread Tools Rate Thread
Author
Thread Post New Thread    Reply
Registered
 
Join Date: Aug 2006
Posts: 96
Thermal Reactor By-pass Headers - Installation Tips

Hi guys - just got a used set of headers for my '77 911s 2.7 and will finally be able to chuck the thermal reactors (!). I am wondering what the installation is going to be like - am I going to encounter broken studs, or break them? Should I soak them overnight with something like PB Blaster? Anyone who has done this job - your input is welcome.

TIA!

Old 11-07-2007, 12:03 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #1 (permalink)
Registered
 
Join Date: Oct 1999
Posts: 8,673
Do PB blaster for several days. Every 24 hours for 4-5 days before you start. Hit the studs w/ a small sledge each time (not too hard). The vibration helps.
Old 11-07-2007, 06:42 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #2 (permalink)
Registered
 
Join Date: May 2001
Location: Peoples Republic of Long Beach, NY
Posts: 21,140
chances are the reactors have been on since new ?

if so take the car in to a 911 shop or you'll be paying plenty to straighten up your mess.

the TR exhaust and heat exchangers constrict exhaust big time. Even with the mod headers to the heat exchangers they suck. Get a used set of SSI. Your muffler should be 2 in so you can still use that.
__________________
Ronin LB
'77 911s 2.7
PMO E 8.5
SSI Monty
MSD JPI
w x6
Old 11-08-2007, 11:01 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #3 (permalink)
Registered
 
Join Date: May 2000
Location: Los Alamos, NM, USA
Posts: 6,044
Forget about the PB blaster or other penetrating oils. These are the infamous "necked down studs" in these models. Heat the nuts cherry red with a torch and spin them off while they're hot - have the wrench/socket ready. Carefully chase the stud threads and use new nuts with thread anti-seize compound upon installation of the three- to-ones. Some go as far as heating the heads at the stud base and removing the necked down studs and replacing them with normal cross-section steel studs. Chances are you'll break a stud despite these measures but good luck!

Old 11-08-2007, 11:33 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #4 (permalink)
Reply


 


All times are GMT -8. The time now is 12:44 AM.


 
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2025 Pelican Parts, LLC - Posts may be archived for display on the Pelican Parts Website -    DMCA Registered Agent Contact Page
 

DTO Garage Plus vBulletin Plugins by Drive Thru Online, Inc.