|
|
|
|
|
|
Gon fix it with me hammer
|
i'm not doing the whole house in one go, Jim... just little bit's along the way...
just did some finishing work on the doubleglazing they installed this week. ![]() i'm not going to win any prizes, but it'll do for now... the front will get done in a couple of years, gotta balance my budget between gathering parts for the future 911, and the house..
__________________
Stijn Vandamme EX911STARGA73EX92477EX94484EX944S8890MPHPINBALLMACHINEAKAEX987C2007 BIMDIESELBMW116D2019 |
||
|
|
|
|
Registered
Join Date: Oct 2005
Location: Magnolia State
Posts: 7,548
|
Quote:
![]() We're doing inexpensive projects at present such as painting. Still shopping for deals on counter tops/cabinets. I like quality materials but hate the exorbitant pricing. Didn't you do some garage work to start with?
__________________
Jim 1987 Carrera 2002 BMW 525ti 1997 Buell Cyclone cafe project 1998 Buell S1W: "Angriest motorcycle I've ever ridden." Last edited by Dueller; 03-06-2010 at 10:18 AM.. |
||
|
|
|
|
Gon fix it with me hammer
|
i initially thought about building a work bench, but ended up buying 2 1.5 meter pre-built benches...
Other then that, not much done to the garage. spent my time putting in a roof window , insulating, and building a shower.. it's functional, but need to get it finished cosmetically... Realistically, i'm not good at finishing things, cosmetically And can't be arsed to pay somebody to make things prettier... I don't think that will change, not until i have a 911 with running engine I have no wife or gf... so i have nobody setting my priorities straight with important things... No nagging either when something isn't finished on target, or according to some kind of interior design plan
__________________
Stijn Vandamme EX911STARGA73EX92477EX94484EX944S8890MPHPINBALLMACHINEAKAEX987C2007 BIMDIESELBMW116D2019 |
||
|
|
|