Pelican Parts
Parts Catalog Accessories Catalog How To Articles Tech Forums
Call Pelican Parts at 888-280-7799
Shopping Cart Cart | Project List | Order Status | Help



Go Back   Pelican Parts Forums > Miscellaneous and Off Topic Forums > Off Topic Discussions


Reply
 
LinkBack Thread Tools Rate Thread
Author
Thread Post New Thread    Reply
canna change law physics
 
red-beard's Avatar
 
Join Date: Jul 2000
Location: Houston, Tejas
Posts: 43,366
Garage
New Battery - Charges 70% in 2 min

Article here:

New Batteries Take 2 Minutes to Recharge 70%

I am a bit skeptical.

To recharge a 60kWh Tesla, 70% in 2 min, assuming we hold the charging voltage to 600 Volts means a charging current of 2100 Amps. 600 is the defined "low voltage" threshold.

This would be 1.26 MW of power! Serious switching equipment would be needed.

To carry this would require a cable made from ten 4/0 copper cables, each 0.46 inches (11.7 mm) in diameter.

If we use can use 6000V (medium voltage), then it would require only one 4/0 cable. However the rules are very different above 600V

Any thoughts?

__________________
James
The pessimist complains about the wind; the optimist expects it to change; the engineer adjusts the sails.- William Arthur Ward (1921-1994)
Red-beard for President, 2020
Old 10-20-2014, 05:30 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #1 (permalink)
Max Sluiter
 
Flieger's Avatar
 
Join Date: Mar 2006
Location: So Cal
Posts: 19,644
Garage
Yeah, the 70% charge in 2 minutes only applies to the AA sized cells they tested. YMMV Or maybe they are banking on Lockheed-Martin's pocket-sized fusion reactor.
__________________
1971 911S, 2.7RS spec MFI engine, suspension mods, lightened
Suspension by Rebel Racing, Serviced by TLG Auto, Brakes by PMB Performance
Old 10-20-2014, 05:39 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #2 (permalink)
Gary H 1978 911 SC
 
Join Date: Oct 2003
Location: Fort Worth Texas
Posts: 1,306
I do not see the numbers adding up with Ohms law still in effect + the 20 years.
__________________
Gary H 1978 911 SC
Old 10-20-2014, 05:40 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #3 (permalink)
Get off my lawn!
 
GH85Carrera's Avatar
 
Join Date: Nov 2007
Location: Oklahoma
Posts: 84,683
Garage
I would love to call the power company and tell them I need megawatt power at my house. How long would they laugh.
__________________
Glen
49 Year member of the Porsche Club of America
1985 911 Carrera; 2017 Macan
1986 El Camino with Fuel Injected 350 Crate Engine
My Motto: I will never be too old to have a happy childhood!
Old 10-20-2014, 07:14 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #4 (permalink)
canna change law physics
 
red-beard's Avatar
 
Join Date: Jul 2000
Location: Houston, Tejas
Posts: 43,366
Garage
The issue is "demand". In commercial settings you are charged by the kilowatt-hour, THEN you are charged by your maximum demand. That demand charge will be very very costly.
__________________
James
The pessimist complains about the wind; the optimist expects it to change; the engineer adjusts the sails.- William Arthur Ward (1921-1994)
Red-beard for President, 2020
Old 10-20-2014, 08:05 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #5 (permalink)
canna change law physics
 
red-beard's Avatar
 
Join Date: Jul 2000
Location: Houston, Tejas
Posts: 43,366
Garage
For commercial properties, the electric charge is as follows:

Quote:
Your average price for electricity will vary according to your usage and the components shown in the LSP rate formula below:
LSP Rate (in $ per KWh) = (Non-bypassable charges + LSP customer charge + LSP demand charge + LSP energy charge)/kWh used
Where:
• Non-bypassable charges shall be all TDU charges and credits for the appropriate customer class in the applicable service territory, and other charges including ERCOT administrative charges, nodal fees or surcharges, RUC capacity short charges attributable to LSP load, and applicable taxes from various taxing or regulatory authorities, multiplied by the level of kWh and kW used, where appropriate.
• LSP customer charge shall be $0.025 per kWh.
• LSP demand charge shall be $2.00 per kW, per month, for customers that have a demand meter, and $50.00 per month for customers that do not have a demand meter.
• LSP energy charge shall be the sum over the billing period of the actual hourly RTSPPs, for the customer’s load zone that is multiplied by number of kWhs the customer used during that hour and that is further multiplied by 125%.
• The minimum LSP energy charge is 4.5¢/kWh.
• RTSPP interval prices are published at Electric Reliability Council of Texas
So, the demand charge is $2 per kW. A 1 MW demand will be a $2000 charge per month. Say you have 10 charging stations. If they are all in use at the same time, anytime per month, the business will be charged $24,000 before actual electricity is charged.
__________________
James
The pessimist complains about the wind; the optimist expects it to change; the engineer adjusts the sails.- William Arthur Ward (1921-1994)
Red-beard for President, 2020
Old 10-20-2014, 08:10 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #6 (permalink)
 
You do not have permissi
 
john70t's Avatar
 
Join Date: Aug 2001
Location: midwest
Posts: 39,808
Old 10-20-2014, 08:43 PM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #7 (permalink)
Get off my lawn!
 
GH85Carrera's Avatar
 
Join Date: Nov 2007
Location: Oklahoma
Posts: 84,683
Garage
So when I have that new mini fusion reactor in my back yard I can charge my electric car in short order.
__________________
Glen
49 Year member of the Porsche Club of America
1985 911 Carrera; 2017 Macan
1986 El Camino with Fuel Injected 350 Crate Engine
My Motto: I will never be too old to have a happy childhood!
Old 10-21-2014, 05:34 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #8 (permalink)
RETIRED
 
Joe Bob's Avatar
 
Join Date: Jul 1999
Location: BOULDER Colorado
Posts: 39,412
Garage
What? You can't set up a lightning rod and collect 1.21 Gigawatts and do a quick charge?
__________________
1983/3.6, backdate to long hood
2012 ML350 3.0 Turbo Diesel
Old 10-21-2014, 06:19 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #9 (permalink)
Get off my lawn!
 
GH85Carrera's Avatar
 
Join Date: Nov 2007
Location: Oklahoma
Posts: 84,683
Garage
But then you need a time machine to go into the future to find out just when and where that lighting bolt will hit so you can be in the right place at the right time when you need it to hit when you go back in time to be ready. Wait, what?

__________________
Glen
49 Year member of the Porsche Club of America
1985 911 Carrera; 2017 Macan
1986 El Camino with Fuel Injected 350 Crate Engine
My Motto: I will never be too old to have a happy childhood!
Old 10-21-2014, 07:28 AM
  Pelican Parts Catalog | Tech Articles | Promos & Specials    Reply With Quote #10 (permalink)
Reply


 


All times are GMT -8. The time now is 08:19 AM.


 
Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2025 Pelican Parts, LLC - Posts may be archived for display on the Pelican Parts Website -    DMCA Registered Agent Contact Page
 

DTO Garage Plus vBulletin Plugins by Drive Thru Online, Inc.