![]() |
|
|
|
Ubi bene ibi patria
|
Bridge Construction - Simplified (?)
Granted, this has relatively limited application but is still pretty good stuff. Cheers JB
__________________
“Two possibilities exist: either we are alone in the Universe or we are not - both are equally terrifying” ― Arthur C. Clarke "As soon as laws are necessary for men, they are no longer fit for freedom." - Pythagoras |
||
![]() |
|
Get off my lawn!
|
If that was in the USA the federal government would have to get involved and take over and then make a federal department and spend a billion dollars to build a bridge that only lasts a few years and then charge a toll to cross it.
__________________
Glen 49 Year member of the Porsche Club of America 1985 911 Carrera; 2017 Macan 1986 El Camino with Fuel Injected 350 Crate Engine My Motto: I will never be too old to have a happy childhood! |
||
![]() |
|
Banned
Join Date: Apr 2005
Location: Columbus, OH
Posts: 18,162
|
Cool. Thanks for sharing.
|
||
![]() |
|
Banned
Join Date: Apr 2005
Location: Columbus, OH
Posts: 18,162
|
That work force seemed to be lacking in diversity. All involved need to be forced into diversity train courses while the EPA conducts a 5 year, $40 million dollar environmental impact study. Another 5 years of squabbling over an endangered salamander in the river will tack on another $20 million. Then the project will get handed over to the Bechtel Corporation in a no bid contract. After massive delays and cost overruns due to 'unforeseen circumstances', the new bridge will completed, only to be deemed worthless by the locals because it will only accommodate vehicle traffic. Officials will explain that there are no footpaths because no one brought it up during the 'comment' period 17 years earlier.
|
||
![]() |
|
Dog-faced pony soldier
|
Quote:
If it makes you feel better it's no different with public sector vertical construction. |
||
![]() |
|
Registered
Join Date: Apr 2013
Location: Nevada City, Ca
Posts: 2,210
|
They should have been contracted to build the San Francisco/ Oakland Bay bridge. Cheaper and probably stronger!
|
||
![]() |
|
![]() |
Registered
|
But is it "Barrier Free"?
Yep, this is a beautiful thing this bridge and the traditions of the people there.
__________________
1977 911S Targa 2.7L (CIS) Silver/Black 2012 Infiniti G37X Coupe (AWD) 3.7L Black on Black 1989 modified Scat II HP Hovercraft George, Architect |
||
![]() |
|
Too big to fail
|
I have a friend who is a CE. One of the projects on his plate is replacing a small bridge across a creek in the middle of nowhere, probably 30'-40' long, just a few feet high. The original was built in the 20's. There are 4 or 5 families that live on the other side. The cost will be about $2.5M
__________________
"You go to the track with the Porsche you have, not the Porsche you wish you had." '03 E46 M3 '57 356A Various VWs |
||
![]() |
|
GAFB
Join Date: Dec 1999
Location: Raleigh, NC, USA
Posts: 7,842
|
Fascinating - thanks for the post.
Makes me wonder how they strung the first cable on the first bridge, all those hundreds of years ago.
__________________
Several BMWs |
||
![]() |
|
Model Citizen
Join Date: May 2007
Location: The Voodoo Lounge
Posts: 18,817
|
Like an Inca from Peru!
|
||
![]() |
|
![]() |
Thread Tools | |
Rate This Thread | |
|