 
					|   | 
 | 
 | 
| 
 | 
| Bland | 
				__________________ 06 Cayenne Turbo S and 11 Cayenne S 77 911S Wide Body GT2 WCMA race car 86 930 Slantnose - featured in Mar-Apr 2016 Classic Porsche Sold: 76 930, 90 C4 Targa, 87 944, 06 Cayenne Turbo, 73 911 ChumpCar endurance racer - featured in May-June & July-Aug 2016 Classic Porsche | ||
|  04-06-2024, 09:50 AM | 
 | 
| Navin Johnson Join Date: Mar 2002 Location: Wantagh, NY 
					Posts: 8,818
				 | 
			That pic is looking down on one of the destroyed piers Imagine looking at this pier from above...   
				__________________ Don't feed the trolls. Don't quote the trolls  http://www.southshoreperformanceny.com '69 911 GT-5 '75 914 GT-3 and others | ||
|  04-06-2024, 12:00 PM | 
 | 
| Back in the saddle again Join Date: Oct 2001 Location: Central TX west of Houston 
					Posts: 56,331
				 | Quote: 
 Quote: 
 
				__________________ Steve '08 Boxster RS60 Spyder #0099/1960 - never named a car before, but this is Charlotte. '88 targa  SOLD 2004 - gone but not forgotten | ||
|  04-06-2024, 03:43 PM | 
 | 
| Still here | |||
|  04-06-2024, 05:26 PM | 
 | 
| Bland | 
			
This is Tim’s wheelhouse. It’s awesome having his expertise chime in on this bridge disaster.
		 
				__________________ 06 Cayenne Turbo S and 11 Cayenne S 77 911S Wide Body GT2 WCMA race car 86 930 Slantnose - featured in Mar-Apr 2016 Classic Porsche Sold: 76 930, 90 C4 Targa, 87 944, 06 Cayenne Turbo, 73 911 ChumpCar endurance racer - featured in May-June & July-Aug 2016 Classic Porsche | ||
|  04-06-2024, 05:45 PM | 
 | 
| Registered Join Date: Dec 2017 Location: Opelika, Alabama 
					Posts: 5,021
				 | 
				__________________ "A little nonsense now and then is relished by the wisest men." Wonka | ||
|  04-06-2024, 08:09 PM | 
 | 
|   | 
| Registered Join Date: Dec 2017 Location: Opelika, Alabama 
					Posts: 5,021
				 | 
				__________________ "A little nonsense now and then is relished by the wisest men." Wonka | ||
|  04-06-2024, 08:10 PM | 
 | 
| Registered Join Date: Dec 2017 Location: Opelika, Alabama 
					Posts: 5,021
				 | 
				__________________ "A little nonsense now and then is relished by the wisest men." Wonka | ||
|  04-06-2024, 08:35 PM | 
 | 
| Navin Johnson Join Date: Mar 2002 Location: Wantagh, NY 
					Posts: 8,818
				 | 
			I wonder how frequently these ships experience loss of power/steerage.. This ship had three tugs assisting it, but required three more tugs to bring it under control https://nypost.com/2024/04/07/us-news/massive-container-ship-loses-power-near-nycs-verrazzano-bridge-days-after-baltimore-key-bridge-disaster/ 
				__________________ Don't feed the trolls. Don't quote the trolls  http://www.southshoreperformanceny.com '69 911 GT-5 '75 914 GT-3 and others Last edited by TimT; 04-07-2024 at 01:22 PM.. | ||
|  04-07-2024, 01:20 PM | 
 | 
| Registered Join Date: Oct 2003 Location: Mount Pleasant, South Carolina 
					Posts: 14,296
				 | 
			Good question on loss of propulsion frequency. What would’ve happened if there was not an extra three tugs or the three tugs did not make it in time?  I see the ship left for Charleston SC after repairs. Note to self, stay off bridges for the next few days! | ||
|  04-07-2024, 01:32 PM | 
 | 
| Bland | Quote: 
 Seems like a tremendous way to destroy infrastructure is to disable the control of a large ship just before it passes under a bridge. 
				__________________ 06 Cayenne Turbo S and 11 Cayenne S 77 911S Wide Body GT2 WCMA race car 86 930 Slantnose - featured in Mar-Apr 2016 Classic Porsche Sold: 76 930, 90 C4 Targa, 87 944, 06 Cayenne Turbo, 73 911 ChumpCar endurance racer - featured in May-June & July-Aug 2016 Classic Porsche | ||
|  04-07-2024, 01:44 PM | 
 | 
| Navin Johnson Join Date: Mar 2002 Location: Wantagh, NY 
					Posts: 8,818
				 | 
			I forgot to mention, the Verrazzano has a robust protection system around the towers.. basically tons of riprap around the tower base/pier caps.. Though I wonder if even that is enough...The impact energy of a 100,000 ton ship going 8 knots hitting an object at 90 deg is like a really big hard to comprehend number 
				__________________ Don't feed the trolls. Don't quote the trolls  http://www.southshoreperformanceny.com '69 911 GT-5 '75 914 GT-3 and others | ||
|  04-07-2024, 01:44 PM | 
 | 
|   | 
| Navin Johnson Join Date: Mar 2002 Location: Wantagh, NY 
					Posts: 8,818
				 | 
			Expanding on why this  will not be an easy fix... A few other structures were mentioned that were put back in service "ahead of time" LA, Philly, and Atlanta? were mentioned.. those are all small simple span bridges.. Access is easy, you can drive right up with 10 wheelers and loaders and start removal of the rubble... Its easy to erect new steel, easy to support the structure while it being built.. This is cribbing and a jacking frame being built so this structure (and approach ramp to the GW bridge) Highbridge in the background.. can be jacked up and the old rocker bearings removed, and new MR bearings installed..  And simply scale.. The span of they Key bridge is, just guessing 3, 500 foot spans to be replaced, and a portion of one of the approaches that was also damaged.. I would imagine they are going to use the remaining approaches to build from.. In these pics are deck panels for the 59th St bridge.. a few months production   Con't 
				__________________ Don't feed the trolls. Don't quote the trolls  http://www.southshoreperformanceny.com '69 911 GT-5 '75 914 GT-3 and others | ||
|  04-07-2024, 02:44 PM | 
 | 
| Navin Johnson Join Date: Mar 2002 Location: Wantagh, NY 
					Posts: 8,818
				 | 
			A lot goes on behind the curtain.. that guy is mag particle testing welds on a section cut from a sacrificial  deck panel.. And if you think that beam looks curved, it is...the beams are rolled and camber is put into the beam/panel.. so when it is in place its flat with no preload...  We all love tools... bad ass table saw  This is a pic from one of the first jobs where I was a chief.. superstructure steel.. Willy B .. replacement of outer roadway floor beams and deck, demolition and replacement of existing approaches.. and a full repaint..  We had 6 Manitowoc crawlers, that big barge mounted crane... a gantry to deliver the panels.. The pic is crappy on the main span much of the outer roadway is already removed... on the nearest span you see... lead remediation is taking place prior to demo.. and the near tower is surrounded by a scaffold system.. waiting for the negative pressure containment system.. All while maintaining pedestrian, train, auto and ship traffic.. 
				__________________ Don't feed the trolls. Don't quote the trolls  http://www.southshoreperformanceny.com '69 911 GT-5 '75 914 GT-3 and others | ||
|  04-07-2024, 03:02 PM | 
 | 
| Registered Join Date: Oct 2003 Location: Mount Pleasant, South Carolina 
					Posts: 14,296
				 | Quote: 
 | ||
|  04-07-2024, 05:31 PM | 
 | 
| Registered Join Date: Oct 2003 Location: Mount Pleasant, South Carolina 
					Posts: 14,296
				 | 
			Thank you for the pictures and information, Tim. Keep it coming!
		 | ||
|  04-07-2024, 05:37 PM | 
 | 
| Registered Join Date: Sep 2015 Location: NY 
					Posts: 7,010
				 | 
			
I’m calling BS. We all know the bridges are like that because the tire manufacturers kick back 25% of the replacement costs from every blowout in NYC…
		 | ||
|  04-07-2024, 06:04 PM | 
 | 
| Registered Join Date: May 2017 
					Posts: 15,527
				 | 
			Great info, Tim.  Thanks!
		 
				__________________ Southwest Oklahoma | ||
|  04-07-2024, 06:05 PM | 
 | 
| Still here |   | ||
|  04-23-2024, 06:14 PM | 
 | 
| Bland | 
			so... nearly a month later. https://www.cbsnews.com/baltimore/news/salvage-recovery-key-bridge-collapse-baltimore-one-month/ I wonder what design work is underway to replace the bridge and what that timeline could look like. I get that they are still cleaning up but I dont understand why design and procurement couldn't be a parallel path to cleanup (hopefully they are). There are 3 temporary channels open now and it sounds like the latest one may be able to support some cargo ship traffic. Is this big enough? I have no idea. The new temporary path, with a controlling depth of 20 feet (6.1 meters), a horizontal clearance of 300 feet (91.4 meters) and a vertical clearance of 135 feet (41.2 meters), allows a greater variety of vessels to access the port while crews work to reopen the main channel, Coast Guard and port Capt. David O’Connell said in a news release. https://toronto.citynews.ca/2024/04/20/third-temporary-channel-opens-for-vessels-to-baltimore-port-after-bridge-collapse/ 
				__________________ 06 Cayenne Turbo S and 11 Cayenne S 77 911S Wide Body GT2 WCMA race car 86 930 Slantnose - featured in Mar-Apr 2016 Classic Porsche Sold: 76 930, 90 C4 Targa, 87 944, 06 Cayenne Turbo, 73 911 ChumpCar endurance racer - featured in May-June & July-Aug 2016 Classic Porsche | ||
|  04-24-2024, 01:46 PM | 
 |